Guerrillas disrupt enemy's railway supply line for 14-20 days in Luhansk Oblast

3 December 2022, 04:09 PM
In Luhansk region, partisans cut off the enemy's railway supply (Photo:Сергій Гайдай/Telegram)

In Luhansk region, partisans cut off the enemy's railway supply (Photo:Сергій Гайдай/Telegram)

The Ukrainian guerrillas set fire to railway control equipment in the Luhansk and Latrnivka connection line near the Luhansk power plant (Shchastia), Luhansk Oblast governor, Serhiy Haidai, reported on Telegram on Dec. 3.

"Russians, be careful, Luhansk guerrillas are in action,” Haidai wrote.

“’Someone’ set railway control equipment (a switchbox) on fire. It happened on the railway line connecting between Luhansk and Latranivka near Luhansk power plant (Shchastia). Fire destroyed the equipment."

Experts said, the destruction of the equipment will force the section to switch to manual control mode, so it will be impossible to supply invading russists forces at the frontline with all they needed in due time.

Video of day

The estimated time to repair the railway equipment is about 14 to 20 days.

Follow us on Twitter, Facebook and Google News

poster
Ukraine Today
Fresh daily newsletter covering the top headlines and developments in Ukraine
Daily at 9am EST
Show more news
X